Summing up what I understood in order to check correctness:
1. One qualification check should be to drive the motor via one single gate and it should run idling at max. duty (25% for 4 gate design, 16,66 for 6 gate design). Preferred less duty than max.
Questions:
- Should the motor arrive in this test requested speed i.e. 3600rpm?
- Any hint regarding voltage or ratio voltage/current?
2. Every setup requires a certain minimum voltage / current in order to start the magic:
- We need an area (angle) where we (a) feed a gate actively and another area (angle) where we (b) harvest HER gift.
- It is preferred to decrease charging area (angle) and increase harversting area (angle)
- Harvesting energy depends on amount of magnetic energy being interupted in a sudden from hot current. Magentic energy being linearly related to hot current applied and number of turns and somehow design of coil (bifilar...).
- Overall magnetic energy in the motor is being built up at startup and maintained while running.
- Harvesting depends on maximum current reached at every pulse just before interruption. It can be build up slowly by low voltage (high duty required) or fast by higher voltage (lower duty required).
3. Suggestion for test. (please comment or confirm)
All builders shall take data from test below:
- Set up your preferred voltge (1.....4 batteries)
- Take data with one single gate energized and with all gates energized
- When idling: check max. rpm at full duty cycle (25% for 4 gate design ....)
- When idling: chack max. rpm at have duty cycle (12.5% for 4 gate design...)
- Let's discuss data obtained
Hint: Most processes in nature are nonlinear. It is estimated that this applies to harvesting radiant as well. Hence it might be very convenient to apply (later on) short high voltge pulses in order to drive magnetic effects in nonlinear area while feeding minute hot energy at input. (Given the state at very switch off time is essential).
With this in mind I feel it to be very importent to find an initial test procedure like suggested above in order to have a solid and common foundation for further elicitations.
JS

I stepped out as I should have. Using the code for about two weeks now for me has been frustrating. Although at first I thought Garry had overcome the time choke issue, I do not see that at this time.
Especially if the wire is only 25mm long?
Leave a comment: