PDA

View Full Version : Bedini Energizer Battery tests


Solace
04-25-2012, 01:30 PM
I found this test on RexResearch but would like to know if anyone has done a similar test and documented the amount of power that was transferred to the batteries. If so, could you cut and paste it in this thread? For example, when the battery was drained from full charge to 10 volts or whatever, what was the current flow as well as the amount of time that elapsed for the discharge to 10 or so volts...

BATTERY TEST FOR THE BEDINI MOTOR GENERATOR
(Unidentified internet source)

DATE : OCTOBER 13, 2000

BATTERY TEST SEQUENCE:

One lead acid gel-cell (12 volts, 450 milliamps) is being utilized as the primary source fully charged at 12.5 volts

Three (3) lead acid gel-cell batteries (12 volt, 450 milliamps) strapped in parallel are being used as the charge destination. The batteries are discharged to 10 volts for the test purposes.

Test #1 starts at 10:45 AM utilizing primary battery fully charged at 12.5 volts charging three (3) destination batteries paralleled. The destination batteries reach a charge capacity of 14 volts at 11:20 AM.

The destination batteries are then discharged to 10 volts under working load to prepare for Test #2.

Test #2 starts at 11:25 AM utilizing primary battery measured at 11.5 volts. Charging three (3) destination batteries paralleled. The destination batteries reach a charge capacity of 14 volts at 12:50 PM.

The destination batteries are then discharged to 10 volts under working load to prepare for Test #3.

Test #3 starts at 1:00 PM utilizing primary battery measured at 10.5 volts. Charging three (3) destination batteries paralleled. The destination batteries reach a charge capacity of 14 volts at 1:40 PM.

The destination batteries are then discharged to 10 volts under working load to prepare for Test #4.

Test #4 starts at 2:05 PM utilizing primary battery measured at 9.5 volts. Charging three (3) destination batteries paralleled. The destination batteries reach a charge capacity of 13 volts at 2:40 PM. The primary battery is now discharged to 9 volts under working load and unable to further run the
Bedini motor generator.
TOTAL BATTERIES CHARGED:

12 lead acid gel-cell batteries (12 volts, 450 milliamps each). This ratio is a 12 to 1 charging factor. The motor operation (work) being performed as this was done is not included as an additional factor in this test.